Gas approval for a food truck
A food truck or enclosed unit that cooks with propane needs its gas system approved. If it doesn’t already carry an accredited certification mark or inspection-body label, a licensed gas contractor takes out an installation permit and a Technical Safety BC officer inspects it and fixes a decal. Enclosed units also need exhaust interlocked with the gas supply and a professional engineer’s report on NFPA 96 at the final inspection. Carts are certified by an accredited body instead. Any later change to the gas system needs a new permit and decal.
- Who issues it
- Technical Safety BC
Do you need it?
You need it if
- Your truck, trailer or enclosed unit cooks with propane or natural gas and doesn’t already carry a certification mark.
You don’t need it if
- It’s a cart certified by an accredited body instead.
Where this comes from
Sources
- Directive D-GA-2014-02: Mobile Outdoor Food Service Unit Gas Approval RequirementsTechnical Safety BC · Revision 3, January 19, 2026
How to get it
- 1
Hire a licensed gas contractor
They apply for the permit, listing every gas appliance and serial number; the fee is based on the total BTU input.
- 2
Have it inspected as it is built
The contractor books inspections at each stage of construction.
- 3
Get the decal
A Technical Safety BC officer inspects the finished unit and fixes the decal. Enclosed units also need a professional engineer’s NFPA 96 report at the final inspection.
Where this comes from
Sources
- Directive D-GA-2014-02: Mobile Outdoor Food Service Unit Gas Approval RequirementsTechnical Safety BC · Revision 3, January 19, 2026
- Food trucks: permits and gas installation, all you need to knowTechnical Safety BC · July 20, 2023
Once you have it
- The decal lasts the life of the truck — unless you change the gas system or appliances, which needs a new permit, inspection and decal.
Where this comes from
Sources
- Food trucks: permits and gas installation, all you need to knowTechnical Safety BC · July 20, 2023
- Directive D-GA-2014-02: Mobile Outdoor Food Service Unit Gas Approval RequirementsTechnical Safety BC · Revision 3, January 19, 2026
What comes next
Which businesses need it
The rules behind this page
- Directive D-GA-2014-02: Mobile Outdoor Food Service Unit Gas Approval RequirementsTechnical Safety BC · Revision 3, January 19, 2026